Concrete calculation program and costs for all concrete elements
How to calculate concrete and rebar in an approximate and fast way, until accurate designs are made
Examples
First: the regular ceiling (Solid Slab)
2- Ceiling area = 200 square meters
3- Amount of concrete = roof thickness x roof area
4- The amount of concrete = 0.15 x 200
5- The amount of concrete = 30 cubic meters
6- The amount of iron = 80 / 100 kg / cubic meter
7- The amount of iron = 80 x 30
8- The amount of iron = 2400 kilograms
9- The amount of iron = 2.40 tons
Second: the cameras
1- The amount of concrete = 1/3 the amount of ceiling concrete 2- The amount of concrete = 1/3 x 30 3- The amount of concrete = 10 cubic meters 4- The amount of iron = 60 / 70 kg / cubic meter 5- The amount of iron = 60 x 10 6 - Amount of iron = 600 kilograms 7 - Amount of iron = 0.60 tons Total amount of iron = Amount of iron (roof) + Amount of iron (beams) Amount of iron = 2.40 + 0.60 Amount of iron = 3 tons Amount of concrete = Amount of concrete (ceiling) + Amount Concrete (beams) The amount of concrete = 30 + 10 The amount of concrete = 40 cubic meters